Neelam Jehlum Visit

A delegation of 35 Engineers of IEP from all over Pakistan visited Neelum Jehlum Hydro Power Project on 4, Oct 2017. The delegates first visited the Dam site and then the underground Power House which is about 32 Kms downstream and is connected with the Dam through tunnel. The Project will produce 969 MW Power and is expected to become operational by Apr 2018. The visit was very informative and useful.